METU Library
Türkçe
|
METU Library Digital Collection
Home
About us
Contact
Back
BUILDINGS
All
Video
Photograph
Ephemera
Document
ui-button
Construction of Technology Laboratory (March 3, 1974)
Library B block, carrel rooms and a student studying (October 22, 1967)
Gaziantep Mechanical Engineering office building
Library - Normal floor suspended ceiling is being installed (June 18, 1975)
Rectorate parking lot (September, 1968)
Metallurgy Amphitheatre construction, north facade view (July 7, 1968)
Cafeteria interior and lower door (December 10, 1965)
Exterior view from the east side of the Rectorate building after its completion (September, 1968)
Physics lawns from the Rectorate building (September, 1968)
The construction of School of Foreign Languages
Construction of A. type 1st and 2nd dormitories (1962)
Exterior view from the alley way of the Faculty of Architecture
P
1
2
3
4
5
6
7
8
9
N